Homepage | Set Home | Add to Favorites
Member

Zibo Qingdong Machinery Manufacturing Co., Ltd.


Products
  • No Category
Search
 

Friends links
  • No link

Titanium /Stainless Steel/Cast Iron Durco Pump Casing
Click image to view full size image
Product: Views:225Titanium /Stainless Steel/Cast Iron Durco Pump Casing 
Unit price: Negotiable
MOQ:
Quantity:
Delivery date: Since the payment date Days delivery
Valid until: Long-term effective
Last updated: 2017-12-12 08:36
  Inquiry
Details
1. Company profile 

Zibo ZLT International Trade Co.,Ltd was founded in 2006, and whose factory is ZIBO QINGDONG MACHINERY MANUFACTURING Co., Ltd located in Zibo city ,shandong province ,China.

*Professional Goulds 3196 and Durco parts manufacture 
*All the model include the 17'' about Goulds 3196 
* All the parts without mould cost ,include casing, impeller ,shaft , cover, bearing ..

* Samples can be send firstly 

* quick deliverly time 
 Some model of Durco pump casing :
Part description Size HP. No Material
Durco Casing 1.5X1-6 DAB100 CF8M/CD4/ iron
Durco Casing 1.5X1-8 DAC100 CF8M/CD4/ iron
Durco Casing 3X1.5-6 DAD100 CF8M/CD4/ iron
Durco Casing 3X1.5-8 DAE100 CF8M/CD4/ iron
Durco Casing 3X2-8 DAF100 CF8M/CD4/ iron
Durco Casing 4X3-8(2) DAG100 CF8M/CD4/ iron
Durco Casing 2X1-10 DAH100 CF8M/CD4/ iron
Durco Casing 3X1.5-10 DAJ100 CF8M/CD4/ iron
Durco Casing 3X1.5-10A DAK100 CF8M/CD4/ iron
3. Products pictures :


4. Production - Sand casting 


Other pictures :



 

Caft 
Clarify Process Material
Lost Wax Casting silicon colloidal moulding Stainless steel, carbon steel, low alloy, high chrom, cas iron, bronze, ductile iron brass, etc.
pouring
waterglass bonded machining
testing
Sand Casting resin sand craft moulding Stainless steel, carbon steel, low alloy, high chrom, cas iron, bronze, ductile iron brass, etc.
pouring
silicate bonded sand craft machining
testing
Lost Foam Casting   moulding Stainless steel, carbon steel, low alloy, high chrom, cas iron, bronze,

5. Exhibition :


6.Certificate :






* your drawings/sample is great helpful for us .

* Usually 30 days for the mould pattern , the other 30 days after the sample is confirmed ok .

* Please kindly send us your drawing ,quantity ,we will quote in about 2 days . 



Inquiry